Weekly Report 3Dec2010: Difference between revisions
Jump to navigation
Jump to search
imported>Agopie No edit summary |
imported>Agopie No edit summary |
||
Line 1: | Line 1: | ||
===RHESSI Website Migration=== | ===RHESSI Website Migration=== | ||
I continued working on the [http://hesperia.gsfc.nasa.gov/rhessi2/index.php?id=1 RHESSI Website] migration, adding content including video and slideshows. | I continued working on the [http://hesperia.gsfc.nasa.gov/rhessi2/index.php?id=1 RHESSI Website] migration, adding content including video and slideshows. Most pages have preliminary content or links to final documents. The website should be ready for preliminary launch by the end of the week. | ||
===RHESSI Albedo Imaging Test=== | ===RHESSI Albedo Imaging Test=== | ||
The | Pixon images were created for a flare on the 5Nov2010 on the limb. The | ||
===RHESSI Clean Imaging Test=== | ===RHESSI Clean Imaging Test=== |
Revision as of 19:07, 8 December 2010
RHESSI Website Migration
I continued working on the RHESSI Website migration, adding content including video and slideshows. Most pages have preliminary content or links to final documents. The website should be ready for preliminary launch by the end of the week.
RHESSI Albedo Imaging Test
Pixon images were created for a flare on the 5Nov2010 on the limb. The