Tohban Report 2017-02-08
Jump to navigation
Jump to search
Tohban Reports | |
---|---|
Start Date: | 2017 February 1 |
End Date: | 2017 February 8 |
Tohban: | Pascal Saint-Hilaire |
Tohban email: | pascal@ssl.berkeley.edu |
Next Tohban: | Jim |
List all reports |
Solar Activity
Solar activity was very low this week.
Memory Management
The SSR was typically at 22% at then end of the pass set, not increasing.
Spacecraft Status
Detectors 3 and 6 are active and taking data.
Currently the Cryocooler power is ~75 W and the acceleration is at ~11mg
Data Gaps
DATA GAPS FOR 2017/02/03 TIME RANGE: 2017-02-03T00:00:00.000 -- 2017-02-04T00:00:00.000 NO GAPS IN APP_ID = 1 (VC1-SOH) NO GAPS IN APP_ID = 154 (VC1-PMTRAS) GAPS IN APP_ID = 102 (VC3-MONITOR RATES) WITH PACKET RATE LT 30 N_GAPS 4 GAP START TIME GAP END TIME GAP (SEC) 2017-02-03T14:50:00.000 -- 2017-02-03T15:45:00.000 3300.0000 2017-02-03T17:55:00.000 -- 2017-02-03T18:05:00.000 600.00000 2017-02-03T18:55:00.000 -- 2017-02-03T19:00:00.000 300.00000 2017-02-03T20:05:00.000 -- 2017-02-03T21:05:00.000 3600.0000
Detector issues
D6f livetime crept down a few % to ~80% (from Albert's plots).
Other notes
Spacecraft Management
Decimation | Normal/Vigorous |
HLAT Decimation | Rear decimation |
Night time data (fronts) | plus/minus 4 minutes from daylight |
Night time data (rears) | plus/minus 4 minutes from daylight |
Require extra passes? | No |
Requirement for moving pointer? | No |
Attenuator operation | logic enabled |
Detector problems? | See notes above. |